| Perez-Fortes-2016 | Table 3 | # | 2014 | CAPEX | Output Capacity|Methanol | 496.5 | | EUR_2014 | 1 | t_MeOH/year | |
| Nyari-2020 | Table A4 | # | 2018 | CAPEX | Output Capacity|Methanol | 209.5 | | EUR_2018 | 1 | t_MeOH/year | Calculated manually from: CAPEX = PEC * 6.32, (as stated in the paper) and 5kt/d plant. |
| Bos-2020 | Table S8 | # | 2020 | CAPEX | Output Capacity|Methanol | 169 | | EUR_2020 | 1 | t_MeOH/year | Calculated manually from: CAPEX = PEC * 6.32, (as stated in the paper) and 5kt/d plant. No cost basis cited, assumed to be year of publication. |
| Grahn-2022 | Table 3 | # | 2025 | CAPEX | Output Capacity|Methanol | 700 | | EUR_2019 | 1 | kW_MeOH_LHV | |
| Grahn-2022 | Table 3 | # | 2040 | CAPEX | Output Capacity|Methanol | 300 | | EUR_2019 | 1 | kW_MeOH_LHV | |
| Perez-Fortes-2016 | Table 3 | # | 2014 | OPEX Fixed | Output Capacity|Methanol | 11 | | MEUR_2014/a | 440 | kt_MeOH/year | |
| Nyari-2020 | Table 5 | Admin | 2018 | OPEX Fixed | Output Capacity|Methanol | 0.94 | | EUR_2018/a | 1 | t_MeOH/year | Reported as OPEX Fixed relative (0.45%), manually converted to OPEX FIxed. Nyari misquotes the result from Collodi (2017). admin + overhead component = 30% * (direct_labour + om). Here we have only the 30% * om = 0.45% of TPC . |
| Nyari-2020 | Table 5 | Operation & Maintenance | 2018 | OPEX Fixed | Output Capacity|Methanol | 3.14 | | EUR_2018/a | 1 | t_MeOH/year | Reported as OPEX Fixed relative (1.5%), manually converted to OPEX Fixed. Operation and maintenance. Percentage of the total plant cost (TPC) |
| Nyari-2020 | Table 5 | Tax | 2018 | OPEX Fixed | Output Capacity|Methanol | 2.10 | | EUR_2018/a | 1 | t_MeOH/year | Reported as OPEX Fixed relative (1%), manually converted to OPEX Fixed. In fact, this comprises insurance + taxes. Percentage of the total plant cost (TPC) |
| Grahn-2022 | Table 7 | # | 2025 | OPEX Fixed Relative | | 4 | | percent | | | |